Engagement of qualified engineering and financial staff, co-operation with science representatives as well as consulting, designing and contracting companies from home and abroad have made possible for the company to implement many meaningful projects co-financed from the EU or World Bank funds.
P.U.I. EKO-INWEST S.A. provided Site Supervision as a Firm, Leader, Consortium partner or Subcontractor for the following projects:-
Inverstor’s supervision for the Project „Construction and refurbishment of the multipurpose playing field at the High School in the Town of Świnoujście”
-
Inverstor’s supervision for the Project „Management of the area at the Primary School No 6 in the Town of Świonujście”
-
Investor"s supervision of the project "Construction of water and power supply system for well B-5 in the area of Brodwino water intake and reconstruction of water treatment plant of the Town of Sopot"
-
Reinforcements on the Baltic coast administrated by Maritime Office in Gdynia
-
Comprehensive Sewage Management in the Town of Trzebiatów
-
Construction of bridge over Stara Świna River connecting Wolin and Karsibór island with demolition of the Poniatowski’s Bridge in Świnoujście
-
Development of the Public Regional Hospital in the Town of Nowogard
-
Contract Engineer for the project "Purchase of vessels and technical equipment for RZGW Szczecin, essential for sustenance of inland waterways"
-
Contract Engineer for the project "Building of two specialized vessels (icebreakers) for Regional Water Management Authority in Szczecin to conduct flooding prevention and breaking up of ice jams on the Odra River
-
Investor"s supervision of the project "Construction of building and roofing of south-west stand of the OSiR Wyspiarz stadium at Matejki Street in Świnoujście”
-
Inverstor’s supervision for the project „Town centre integrated Project - reconstruction of the park at Chopina Street”
-
Investor"s supervision in field of road and rain drain system works for the project “Reconstruction of Sosnowa Street” by District of Świnoujście
-
Project Management and investor"s supervision for the project "Reconstruction of the building at 8 Słowackiego Street in Świnoujście for the Regional Prosecutor"s Office"
-
Project Management of the construction of the Bypass of the Town of Szczecinek along regional road No 172
-
Szczecin infrastructure of information society - stage 1: Infrastructure
-
Reconstruction of regional road No 109 on Mrzeżyno - Trzebiatów section
-
Project Management of the construction of the Bypass of the Town of Trzebiatów along regional road No 102
-
Construction of quay in harbour in Świnoujście according to FIDIC rules
-
Reconstruction and expansion of the Baltic coast reinforcements in Kołobrzeg
-
Construction of the Flue Gas Desulfurization System for Power Units 5 and 6 in the Dolna Odra Power Plant
-
Development Works in the Regional Park of Gryfino - Stage I and II
-
Modernization and construction of sewage network ot the Town of Świnoujście
-
Project Management of the construction of the Bypass of the Town of Nowogard along road No S6
-
Development of Basen Północny in Świnoujscie for sailboat port
-
Construction of Sports and Entertainment Arena in Mogilno
-
Infrastructure works on the investment areas of the Town of Włocławek
-
Reorganisation of the Water and Sewage Management in Koszalin - stage I
-
Reconstruction of the East Breakwater in Świnoujście
-
Construction of the Municipal Cemetery in Bronowicka Street in Szczecin - stage I
-
Introduction of the New Form of Touristic Utilisation of the Promenade of Stars in Międzyzdroje
-
Construction of the Social Insurance Office in Andre Citroen Street in Szczecin
-
Construction of the Boat Harbour at the Sopot Pier including an Enclosed Structure on the Pierhead and Repair of the Groin
-
Extension of the School and Education Centre for Hearing-Impaired Children in Wrocław
-
Construction of the Bypass of the Town of Janikowo
-
Construction of the Southern Bypass of the Town of Chelmno
-
Integrated Water and Sewage Management in the Parsęta River Basin - Region II Kołobrzeg
-
Integrated Water and Sewage Management in the Parsęta River Basin - Region III Szczecinek
-
Construction of the Boiler Generating Energy from Biomass in the Szczecin Power Plant
Biomass-fired boiler with steam capacity of 183 MW erected in combined heat and power plant located in Szczecin. Boiler with bubbling fluidized bed technology burns forest residue, willow chips and straw pellets. Investment in the Szczecin Power Plant includes also: biomass storage and transportation system with capacity of 38.000 cubic meter, biofuel tanks with capacity 300 cubic meter, modernization of impulse turbine and electrostatic precipitator. The Szczecin Power Plant will burn 800,000 tons of biomass to produce 440,000 MWh of electricity to national grid and 1.4 million gigajoules of heat a year for the city of Szczecin. By its capacity the Szczecin green energy plant is one of the biggest in Europe and the largest in Poland. -
Reconstruction of pavements, regional and local roads in Świnoujście
-
Remodelling of Gdańska Street in Świnoujście
-
Remodelling of Municipal Stadium in Świnoujście
Under the Projcect removal of existing natural lawn layer, new turf grass laying, construction of rain shelter over hydrophore room, erection of hydrophore, construction of connection to water pipeline, drainage and artificial irrigation of sport field, construction of electrcial installations were made.
-
Construction of the Bypass of the Town of Połczyn Zdrój along District Road No 173
-
Remodelling of the Viaduct in the Town of Białogard along Road No. 163
-
Construction of Carpark at Wybrzeże Władysława IV Street in Świnoujście
Under the Project new 90 parking spaces for passenger cars, acces and maneuver roads, rain water drainage and lighting were built. -
Remodelling of Wybrzeże Wł. IV and Daszyńskiego Streets on Marynarzy to Steyer Street section in Świnoujście
Under the Projcet road, sidewalk, parking bays, bicycle lane, lighting, rain water drainage, 2 sets of rain water pumping stations, hydrocarbon and heavy metal separators at the oultlets from Marynarzy and Rybaki streets, horizontal and vertical marking, reconstruction of the 0,4 kV and 15 kV electrcial and telecommunication installations were made.
-
Remodelling and Vertical Extension of the Pomeranian Library in Szczecin
-
Remodelling and Change in the Way of Usage of the Tram Depot for the Museum of Technology and Transport in Niemierzyńska Street in Szczecin
-
Contract Enginner for the Project No 2000/PL/16/P/PE/016-22
EKO-INWEST S.A. was supervising the following contacts:- Construction, modernization and reconstruction of sewage and water system for the Left River Bank of Szczecin
- Renovation of water supply system
- Optimisation and modification works of the existing process installation of the Water Treatment Plant
-
Construction of the S3 Express Road Szczecin - Gorzów Wlkp. Section No. 1 from Klucz Node to Pyrzyce Node,
-
Construction of the hostel for homeless people at Karsiborska street in Świnoujście
-
Reconstruction of sidewalks and roadways in gmina roads in Swinoujście
The investment task relied in reconstruction of Uzdrowiskowa street on the section from the crossroads with Chrobrego street to the first turn following the crossroads with Zdrojowa, Fredry streets together with reconstruction of dewatering system, Grotger street on the section from the crossroads with Moniuszki street to the crossroads with Siemiradziego street. -
Renovation of the roof over and reconstruction of the stage of city amphitheater in Świnoujście
The investment task relied in demolition of the wall surrounding the stage, stage floors, stage covers, tower covering, tin works as well as treatment of cover steel constructions, stage roof covering, tower covering, lightening, insulation of building walls adjacent to the stage, execution of reinforced concrete footing and concrete walls, execution of stairs and concrete ramps, execution of screen walls, execution of stage steel construction and execution of traffic routes paved with a granite sett and electrical installations. -
Construction of the Southern Bypass of the Town of Stargard Szczeciński along National Road No. 10 Szczecin – Bydgoszcz
-
Project supervision by Investor over the investment tasks of Town and Gmina Świnoujście in 2008-2009
-
Construction of the Grain Silos in Nowogard
The grain silos are indented to take, condition, store and give out grains of ripe. After purification, the material can be directly passed to the storage tanks or the drying room. In order to ensure continuous operation of the dryers, the grain is transported to the buffer tanks. After drying, the grain is passed to one out of 10 silos. The total storage capacity is 77.000 m3, which makes possible to store 50.000 tonnes of ripe. The layout of process routes enable to provide services for purifying and drying ripe grains.
-
Construction of the Pollution Fighting Base in Świnoujście
The scope of works included: modernization of quays No. 13II, 12, 11, 10 of the Northern Basin of the Port and construction of full technical infrastructure for the Sea Rescue Station, a storage and workshop building, the Border Check Point - the Border Point of Survivors' Admission, a container transformer room and hydrotechnical works related to remodelling of quays.
-
Construction of the Sea LPG Terminal in Szczecin
The project valued at more than 50 million zlotys makes possible to load and unload 200.000 tonnes of liquefied gas annually. This is the most modern facility of its kind in Poland. There are three sites to load gas to road tankers and two ones to rail tankers. The terminal enables to unload a 6.000 DWT oil tanker per day and re-load gas to about 60 road tankers and 30 rail tankers. There are three vessels of 1.500 m3 in volume each at the terminal.
-
Improvement on Land of the Bosman Basin – Construction of the Fisherman’s Base in Świnoujście
-
Construction of the Grabów and Dolny Brzeg pumping stations Including Delivery Pipelines and Construction of Sanitary and Water Supply Networks for the Right and Left River Bank of Szczecin
-
Modernization of the Fishery Harbour in Kołobrzeg
The project was financed by the Sectoral Operation Programme - Fishery and Fish Processing 2004-2006. Under the project, 220 m of mooring quays were modernized and three warehouse buildings with social and storage facilities as well as rooms for transporting and storing sea fishery products were built. Additionally, sanitary, rain water, water supply and power supply networks were built.
-
Construction of the Westpomeranian Logistic Centre in the Port of Szczecin
The project was implemented in the years 2005 - 2008 and contributed to the connection of the Port of Szczecin to the European Logistic Centre Networks, expanded the Port's service offer, created possibilities for a fully professional distribution activity and facilitated the client service. The project was co-financed from the European Fund for Regional Development.
-
Access Infrastructure to the Industrial Quay in the Port of Gdańsk
Under the project co-financed by the Sectoral Operation Programme - Transport, the quay was remodelled, a new viaduct with a carrying capacity of 50 tonnes was built and the street towards the mouth was modernized. As a result, a direct road access to the quay for lorry traffic was ensured with its simultaneous elimination from residential districts. Additionally, possibilities were created to utilize about 120 hectares of port development areas. In the long run, the project implementation will allow to develop reloading bases and logistic, distribution or industrial activities.
-
Reconstruction of the Breakwaters and Strengthening of the Banks of the Piastowski Canal
-
Construction of the Geothermal Heat Source in Stargard Szczeciński
The Geothermal Heat Plant extracts hot water with a temperature of 87oC from a depth of 2.700 m. The hot geothermal water heats up the return district heat water in a 14,0 MW titanium plate heat exchanger. After the water is cooled down it is re-injected to the directional injection well with a length of 3.000 m. The thermal possibilities of the heat source enable to cover nearly 25% of the annual heat demand of the city of Stargard. The project significantly contributed to the reduction of harmful emissions. It was implemented in the years 1999-2004 according to FIDIC rules. -
Construction of the Bypass of the Towns Kobylanka, Morzyczyn, Zieleniewo along National Road No. 10 Szczecin-Bydgoszcz
As a result of remodelling, National Road No. 10 on section Szczecin-Motaniec was upgraded to the express road standards. The bypass connected with new nodes and junctions split local and transit traffic of the distant range. The project contributed to the improvement of road safety and to the reduction of noise and exhaust fumes. The first section of the road was commissioned in 2005. -
Modernization and Extension of the International Szczecin-Goleniów Air Port
Thanks to this project which was carried out according to FIDIC rules, possibilities were created to have a high standard passenger air port for the local and international air traffic in Goleniów. Enhancement of the air traffic capacity made possible to open new air connections with Great Britain and Scandinavian countries. -
Construction of the Sugar Silo with a Capacity of 50 tonnes for the Kluczewo Sugar Factory in Stargard Szczeciński
-
Other Projects
Water and Sewage Management Projects
- Water Intakes and Water Treatment Plants in Goleniów, Trzcińsko Zdrój, 1994-1997,
- Sewage Networks in Trzcińsko Zdrój, Pyrzyce and Białogard, 1994-2000,
- Sewage Treatment Plants in Cedynia, Przybiernów, Mieszkowice, Pyrzyce, Goleniów, Trzcińsko Zdrój, Kluczewo, 1988-1996
Designing, Project Management and/or Site Supervision over construction of sewage networks, water intakes, water and wastewater treatment plants
- Making of the Working Building Design of the Water Supply and Sanitary Networks in Morzyczyn, Kobylanka and Reptowo,
- Construction of Sewage Networks in Trzcińsko Zdrój, Pyrzyce, Białogard, Świnoujście and Five Municipalities of the Lake District of Drawsko Pomorskie,
- Construction of the Water Intake and Water Treatment Plant in Goleniów, Trzcińsko Zdrój, Białogard,
- Construction of the Full-Cycle Wastewater Treatment Plant Including Networks in Cedynia, Przybiernów, Mieszkowice, Pyrzyce, Goleniów, Trzcińsko Zdrój, Kluczewo.
Project Management and/or Site Supervision over construction of roads and bridges
- Remodelling of the Passageway Through the Town of Świdwin along Voivodship Road No. 162,
- Construction of the Municipality Road - Józefa Chełmońskiego Street including Urban Infrastructure in w Świnoujście,
- Modernization of National Road No. 10 Szczecin-Bydgoszcz for the Section- Szczecin-Stargard Szczeciński,
- Construction of the Bridge along Voivodship Road No. 107 including Remodelling of the Junction of Voivodship Roads No. 103 and 107 and Modernization of Voivodship Road No. 107 for the Section - Kamień Pomorski - Parłówko including Construction of the Bypass of the Town of Kamień Pomorski,
- Remodelling of Voivodship Road No. 102 in Międzyzdroje,
- Remodelling of the A-6 Motorway for the Section - Klucz Node - Kijewo Node,
- Remodelling of Grunwaldzka Street as a Trans-border Touristic Road to the Border Crossing Świnoujście-Garz - Stage I,
- Construction of the Bypass of the Town of Kobylanka, Morzyczyn, Zieleniewo along National Road No. 10 Szczecin-Bydgoszcz.
Project Management and/or Site Supervision over construction of district heating facilities
- Construction of the DN 200 High Pressure Gas Pipeline Odolany - Pyrzyce.
- Construction of the Modern Geothermal District Heating Plant with a Heat Output of 55 MW including the DH Network and 68 Heat Exchanger Substations in Pyrzyce,
- Complex Remodelling of District Heating Facilities in the Town of Karlino.
Project Management and/or Site Supervision over construction of hospital facilities
- Construction of the Gynaecology and Obstetrics Ward in Stargard Szczeciński
Project Management and/or Site Supervision over construction of civil-engineering and hydrotechnical structures
- Construction of the Sugar Sorting Station in the Kluczewo Sugar Factory in Stargard Szczeciński,
- Restoration of the Historical Zdrojowy Park in Świnoujście - Stage I - Drainage,
- Construction of the Office Building in 7 Fińska Street in Świnoujście.