Construction of the Maritime LPG Terminal in Szczecin
The project valued at more than 50 million zlotys makes possible to load and unload 200.000 tonnes of liquefied gas annually. This is the most modern facility of its kind in Poland. There are three sites to load gas to road tankers and two ones to rail tankers. The terminal enables to unload a 6.000 DWT oil tanker per day and re-load gas to about 60 road tankers and 30 rail tankers. There are three vessels of 1.500 m3 in volume each at the terminal.