The investment task relied in demolition of the wall surrounding the stage, stage floors, stage covers, tower covering, tin works as well as treatment of...
The construction works have been performed under the Programme "Water Quality Improvement in Szczecin" They have been concerned with construction of water...
Under the project, quays and entrance to the basin have been modernized, a cold store with an ice generator and a manoeuvring hall, a social and warehouse...
Thanks to this project which was carried out according to FIDIC rules, possibilities were created to have a high standard passenger air port for the local...
The project valued at more than 50 million zlotys makes possible to load and unload 200.000 tonnes of liquefied gas annually. This is the most modern...
Under the Project remodelling of Gdyńska street on section from crossroad with Szkolna street toward Grunwaldzka street to end of the street, i.e. new...
The project was implemented in the years 2005 - 2008 and contributed to the connection of the Port of Szczecin to the European Logistic Centre Networks,...
Under the Project old bituminous surface was removed and new layer including rain water drainage instrumentation, gas valves, pavements and zebra crossings...
EKO-INWEST S.A. was supervising the following contacts:
Construction, modernization and reconstruction of sewage and water system for the Left River...
As a result of remodelling, National Road No. 10 on section Szczecin-Motaniec was upgraded to the express road standards. The bypass connected with new nodes...
The investment task relied in reconstruction of Uzdrowiskowa street on the section from the crossroads with Chrobrego street to the first turn following the...
S3 Express Road Szczecin - Gorzów Wlkp. Section No. 1 from Klucz Node to Pyrzyce Node has lenght of 28,2 km. New dual carriageway (2x2 lanes) consist of 2...
The Geothermal Heat Plant extracts hot water with a temperature of 87oC from a depth of 2.700 m. The hot geothermal water heats up the return district heat...
Under the project co-financed by the Sectoral Operation Programme - Transport, the quay was remodelled, a new viaduct with a carrying capacity of 50 tonnes...
The scope of works covered the following investment tasks related to reconstruction of sidewalks and roadways in powiat and gmina roads in Swinoujście, i.e....
The project was financed by the Sectoral Operation Programme - Fishery and Fish Processing 2004-2006. Under the project, 220 m of mooring quays were...
That was the most important and largest hydrotechnical project realized by the Maritime Office in Szczecin in the years 2001-2004 according to the FIDIC and...
Under the Projcet road, sidewalk, parking bays, bicycle lane, lighting, rain water drainage, 2 sets of rain water pumping stations, hydrocarbon and heavy...
The investment task relied in reconstruction and expansion of the existing buildings, construction of the utility building with the carport and construction...
Under the Project new junction to existing road, i.e. new road intersections, new road (G class) with bituminous surface 6,0 m width and 1,2 km long were made.
Refurbishment was co-financed by the European Regional Development Fund within the Operational Programme of Regional Development of the West Pomeranian...
The grain silos are indented to take, condition, store and give out grains of ripe. After purification, the material can be directly passed to the storage...
The scope of works included: modernization of quays No. 13II, 12, 11, 10 of the Northern Basin of the Port and construction of full technical infrastructure...
Under the Projcect removal of existing natural lawn layer, new turf grass laying, construction of rain shelter over hydrophore room, erection of hydrophore,...
The ring road, bypassing Stargard Szczeciński from west and south, opened on 21 December 2009, constitutes a part of future express road S10.
The ring road...
Under the Project old elements of the structure, i.e. fittings, surface of the road and pavements, balustrade, kerbs were replaced or renovated and new...
Under the Projcect removal of existing natural lawn layer, new turf grass laying, construction of rain shelter over hydrophore room, erection of hydrophore, construction of connection to water pipeline, drainage and artificial irrigation of sport field, construction of electrcial installations were made.
We use cookies at this site to ensure that you get the best user experience. To continue using our site without it please find out more information on how to block cookies or leave this page.